Today, marked the start of work on the next stage of my TT120 scale model railway.
There is quite a lot to do on this cantering around a return loop with Dual Frog Juicer and a new bridge. However, I also need to install point motors in the station, start ballasting, change the arrangement of the power and wiring, make a few suitable buildings and create a panel showing the track plan with various lights.
At some point I will replace the existing bridge and finish platforms 1 and 2, of which only 1 is partly done.
Other things are to work out the signalling and whether to have any controlled. This will probably be semaphore on the ex-LNER track and colour light on the ex-LMS track.
